Skip to content

Anticipated road blockages from protests taking place

Agricultural sector in Bavaria staged demonstrations from January 4 to 12, 2024, featuring farmers, transportation providers, and various industry players.

Anticipated road delays resulting from protests
Anticipated road delays resulting from protests

Anticipated road blockages from protests taking place

Headline: Demonstration Routes Announced for Bavarian Farmers' Protest in January 2024

On the horizon of January 2024, a series of demonstration routes, colloquially known as 'star trips,' have been announced in the Fürth and Nuremberg region. Organized by the Nürnberger Bündnis Nazistopp (Nuremberg Alliance to Stop Nazis) and the Bavarian Farmers' Association, these protests are set to take place from January 4 to January 12.

The demonstrations will pass through various streets before reaching the cities of Fuerth and Nuremberg. Each route will traverse multiple streets in the District of Fuerth, including Hauptstraße, Bahnhofstraße, Gebersdorfer Straße, Schwabacher Straße, An der Post, Bahnhofplatz, Gebhardtstraße, Gabelsberger Straße, Kirchenstraße, Nuernberger Straße, Koenigstraße, Friedrichstraße, and Fuerther Freiheit.

On January 8, 2024, the first demonstration route will begin at the meeting point of Kreisverkehr Dauchenbeck / Stein at the economic ways and possibly Hofackerweg. This route will pass through the village of Muencherlbach and various streets including St 2239, B 14, Ansbacher Straße, Schweinauer Hauptstraße, Nopitschstraße, Mittlerer Ring, Ulmenstraße, Frankenstraße, Bayernstraße, and Volksfestplatz, before culminating at the Volksfestplatz in Fuerth.

On January 12, 2024, two demonstration routes have been scheduled. The first route will start from the former B 14 directly east of the city area Heilsbronn (north of B 14), and the second route will pass through the District of Fuerth from Cadolzburg Noerdl. direction Schwadermuehle.

The sixth demonstration route, starting from Heilsbronn, will pass through various streets including An der Bleiche, Sanktustorstraße, Friedrich-Ebert-Straße, Nürnberger Straße, Raindorfer Weg, Seckendorfer Straße, Alte B 8, Burgfarrnbach, Würzburger Straße, Billinganlage, Kapellenstraße, Ludwigbrücke, Erlanger Straße, Poppenreuther Straße, Hans-Vogel-Straße, Hans-Böckler-Straße, Brettergartenstraße, Schnieglinger Straße, Nordwestring, Maximilianstraße, Von-der TannStraße, Gustav-Adolf-Straße, Nopitschstraße, Ulmenstraße, Frankenstraße, Bayernstraße, and Volksfestplatz. Both Route 6 and Route 7 will pass through the city limit of Stein/Nuremberg. The end of both routes is planned for around 13:30 PM on the Volksfestplatz.

The third demonstration route will pass through the District of Fuerth, starting from Veitsbronn OMV/Bernbach, with the meeting point yet to be disclosed. This route will end at Fuerther Freiheit.

Please note that these routes may still be subject to changes in the county. The organisers encourage participants to stay updated on the latest information. These demonstrations aim to bring attention to the concerns of farmers, transporters, and other sectors, and are expected to attract a significant number of participants. Stay tuned for more updates.

Latest

Reports Indicate Multiple Discoveries Concerning the Restoration of Border Regulations

Border Control Reassessment Reveals Key Findings

Border Control Reassessment Reveals Key Findings In a series of incidents at the border crossings near Chemnitz, Germany, several individuals from different countries have been apprehended for various offenses. A 45-year-old Czech national was discovered at the Oberwiesenthal border crossing, with a strong smell of cannabis detected during the control.