Anapa's beaches are being demolished or taken apart.
The demolition of a protective embankment on Anapa's beaches has commenced, marking the start of a planned reconstruction project aimed at modernising the coastal infrastructure. The aging and damaged embankment, with its cracks and structural weaknesses, posed safety concerns and detracted from the beachfront's appeal for both residents and tourists.
## Reasons for Demolition
The decision to demolish the embankment was made due to several factors. Firstly, the structure had deteriorated significantly over time, making it no longer safe. Secondly, the city wanted to modernise the promenade to better withstand coastal erosion and provide enhanced recreational spaces. Lastly, environmental considerations played a role, as the old embankment was less effective in protecting the beach environment from storms and rising sea levels.
## Cleanup and Reconstruction Plan
The demolition process is part of a comprehensive plan that includes debris removal, beach restoration, new embankment construction, and the addition of public amenities. Debris removal is ongoing, with the demolition debris being systematically cleared to make way for new construction. After clearing, the beach will undergo cleaning to remove any pollution or waste disturbed during demolition.
Following the cleanup, a modern, reinforced embankment will be built, incorporating improved drainage and erosion control features. The plan also includes adding pedestrian walkways, lighting, landscaping, and seating areas to make the beachfront more accessible and enjoyable. Authorities aim to complete the cleanup and begin new construction within the current season to minimise disruption.
## Stages of the Demolition and Cleanup
The demolition work is being carried out in three stages. In the first stage, the removal and recycling of polypropylene nets covering the sandbank is underway. In the second stage, the embankment will be leveled using a front-end loader. Divers are still working in some sections to collect fuel oil from the bottom.
One section of the protective embankment will remain intact: from the beach near the "Era" technopark to the mouth of the Meyepsyn River. The final stage involves the use of special equipment for mechanical cleaning of the beaches, sifting the sand, and removing any remaining oil products and waste.
## Impact on Recreational Activities
Recreational activities, including sunbed rental and water attraction rentals, are currently prohibited in Anapa. The ban on visiting beaches and swimming in the sea remains in effect in Anapa. However, the reconstruction project is expected to enhance the beachfront, making it more appealing and suitable for various recreational activities in the future.
Overall, the demolition and cleanup are part of a strategic effort to enhance Anapa’s coastal resilience and appeal as a seaside destination. The project is expected to improve the safety, environmental sustainability, and aesthetic appeal of the beachfront, benefiting both locals and tourists alike.
The decision to demolish the old embankment is tied to several factors, including its deteriorated state, the city's desire for coastal modernization, and concerns about its effectiveness in protecting the environment from climate change, which falls under the realm of environmental science.
As part of the comprehensive cleanup and reconstruction plan, general news outlets are reporting on the ongoing debris removal and the addition of public amenities like pedestrian walkways and seating areas that will contribute to a more enjoyable beachfront experience.
The ongoing demolition work follows a three-stage process, with the removal of polypropylene nets currently underway. This redevelopment project aims to improve Anapa's resilience to coastal erosion and sea level rise, as well as boost its appeal as a tourist destination.